Oso Grande Windfarm, US
The acoustic On-Tower lightning monitor enables TEP continuous monitoring and targeted inspection of wind turbines after storms.
The acoustic On-Tower lightning monitor enables TEP continuous monitoring and targeted inspection of wind turbines after storms.
This case study compares results recorded with the eologix:align-system and an indempendent measurement systen on a FL MD77 wind turbine in Poland.
The purpose of this case study is to illustrate that the data of our relative pitch angle measurement, acquired by the eologix:align system directly on the rotor blade, matches the results of external laser measurements on the ground.
Mainova AG: eologix for Senvion turbines In this customer project, 5 Senvion turbines of the type REpower 3.4M104 were equipped with the eologix:restart system with the special feature that an interface was certified by DNV in order to be able to intervene in the control of the turbine. Wind farm: Niederhambach, Germany Operator: Mainova AG…
GLS wind farm Schleiden – Switch to eologix:restart system with automatic restart An Enercon E-101 was equipped with the eologix:restart system. After just one winter, downtimes due to icing were reduced by almost 50%. Wind farm: Schleiden, Germany Operator: GLS Windpark Schleiden GmbH & Co. KG Wind turbine type: Enercon E-101 About GLS Beteiligungs AG…
eologix:restart fast, safe and maintenance-free In this customer project five wind turbines (Enercon E115) have been equipped with the eologix:restart system. The aim was to minimize downtimes by using the system, which measures directly on the blade surface. The eologix system reacts quickly and accurately. Wind farm: Monschau-Höfen, Germany Operator: STAWAG Energie GmbH Wind turbine…
Ice-Control project of Verbund has shown potential savings In the course of the research project „Ice-Control“ the wind farm Ellern, as a pilot plant, was equipped with an eologix system. The research objective was the development of an icing forecast. Dr Thomas Burchhart, Digitalisation and Innovation Manager at VERBUND Green Power GmbH, provides insight into…
The second wind turbine in Carinthia at 1400m above sea level. The turbine is painted with an edelweiss and a picture of an eastern climber.
The Bowbeat onshore wind farm was commissioned in 2003 and is one of the most powerful wind farms in Scotland.
Situated at almost 1,600 meters, the Steinriegel wind farm is one of the highest wind farms in Europe.