Ice detection

Germany

:RESTART ICE fast, safe and maintenance-free

STAWAG logo

In this customer project five wind turbines (Enercon E115) have been equipped with the :RESTART ICE system. The aim was to minimize downtimes by using the system, which measures directly on the blade surface. The eologix system reacts quickly and accurately.

Insights
STAWAG Energie generates more than 600 million kilowatt hours annually in its own green electricity plants.
STAWAG Energie generates more than 600 million kilowatt hours annually in its own green electricity plants.

Reduction in downtimes

thanks to ice detection directly on the rotor blade surface

STAWAG logo

“[…] An additional positive effect was the good project cooperation [...] - the support was very good.“

Dipl.-Ing. Fotios Chitzios

Technical Operation Manager | STAWAG Energie GmbH, Germany

Positive performance audit

of the commercial department with :RESTART ICE.

Project summary

About the customer

In total, STAWAG Energie already has more than 20 wind farms with a total of 79 wind turbines connected to the grid – the most recent have been built in the north of Aachen, Monschau, Simmerath and Linnich. In total, STAWAG Energie already generates more than 600 million kilowatt hours annually in its own green electricity plants.

Wind farm

Monschau-Höfen

Location

Germany

Operator

STAWAG Energie GmbH

Turbine type

Enercon, E115 2017

Chosen products

:RESTART ICE fast, safe and maintenance-free

In this customer project five wind turbines (Enercon E115) have been equipped with the :RESTART ICE system. The aim was to minimize downtimes by using the system, which measures directly on the blade surface. The EOLOGIX-PING system reacts quickly and accurately.

 

In order to minimize downtimes due to icing, STAWAG invested in a rotor blade-based system. In addition to EOLOGIX-PING two other providers have been evaluated. A clear decision went in favour of the :RESTART ICE system. The reasons for this are simply explained:

  • positive performance audit of the commercial department,
  • simple system setup and 100% maintenance-free,
  • easy installation – as you just have to stick the sensors on the blade.

 

The collaboration with EOLOGIX-PING was a good decision – the support was very good

By law, the Monschau-Höfen wind farm is obliged to stop the wind turbines in case of safety-relevant ice accumulation. Prior to the installation of the EOLOGIX-PING system, an ice detection system based on the power curve was used. This system performed very rough shutdowns and did not allow an automatic restart. When the system had to be restarted when there was no ice anymore, it was necessary to drive to the wind turbine all the time, perform an inspection and then restart the wind turbine manually. 

 

In order to reduce the effort and minimize downtime, we decided to invest in the rotor blade-based system :RESTART ICE, which measures directly on the blade surface and is also DNV-GL certified for automatic restart. 

 

Decisive drivers for the system were the economic efficiency and the simple design of the system with tremendous advantages such as easy installation, maintenance-free operation and measurement of ice thickness in different levels.

STAWAG logo

“The EOLOGIX-PING system is uncomplicated and easy to install. The technology is simple but of good quality and does a very good job. The system reacts quickly and very precisely. An additional positive effect was the good project cooperation with EOLOGIX-PING - the support was very good.“

Dipl.-Ing. Fotios Chitzios

Technical Operation Manager STAWAG Energie GmbH, Germany

After only one winter in operation, the technical operations manager Fotios Chitzios was able to confirm that the EOLOGIX-PING system restarts the system very well and very quickly when there is no ice. After a more precise evaluation, the additional yield can even be evaluated. 

The view from a turbine down into the surrounding area.
The view from a turbine down into the surrounding area.

Copyright: STAWAG Energie GmbH

Share this case study

<p>Newsletter icon</p>
Share via email
<p>In-person event icon</p>

Get in touch with us

Reach out to us for tailored advice on your specific needs, to learn more about our technology, or to schedule a personal consultation. Our dedicated team is ready to assist you every step of the way.

Contact us
<p>Newsletter icon</p>

Subscribe to our newsletter

Stay informed with the latest industry news, fascinating insights, and updates from EOLOGIX-PING delivered straight to your inbox.
PS.: We promise no spam.